Project – Labor & Material Specifications Please enable JavaScript in your browser to complete this form.Project # *Building – Roof Squares *Enter # of squaresBuilding – Parapet Wall Squares *Building – Waste Factor *Building – Total Squares *Building – Labor *Building – Material *Building – Material Add-on (slip sheet, iso board, etc.)Building – Material Total *Tear-Off – InsulationR-25 (2.2")R-30 (2.6")Slip-sheetDumpsters *1) Pressure Washing – Cost1) Pressure Washing – Margin2) Debris / Gravel Removal – Cost2) Debris / Gravel Removal – Margin3) Tapered Insulation – Cost3) Tapered Insulation – Margin4) Metal Coping – Cost4) Metal Coping – Margin5) 2-Piece Comp. Metal – Cost5) 2-Piece Comp. Metal – Margin6) Step Flashing – Cost6) Step Flashing – Margin7) Walk Pads – Cost7) Walk Pads – Margin8) Wall Braces – Cost8) Wall Braces – Margin9) Heavy Equipment [Lift, etc.] – Cost9) Heavy Equipment [Lift, etc.] – Margin10) Gutters & Downspouts – Cost10) Gutters & Downspouts – Margin11) Warranty Inspection – Cost11) Warranty Inspection – MarginSubmit